1.Exhaust pipe shall be installed at the air inlet screen (40 ~ 60),which is to prevent the
granular objects into the vacuum pump.
2.Checking before starting
3.Drilling must be installed before the good debugging.
4.Installation requirements for stationary, connection, reliable fastening; exhaust outlet
according to well control requirements connected with a safe position outside the site.
A. Drainage pipe and the suction pipe end while immersed in a mud pool.
B.Rotation to the machine, vacuum pump and main motor should be consistent with the label direction;
C. Rotation coupling for several weeks, which is to determine not stuck or other damage to the phenomenon of pump.
D.Open valve vacuum pump water supply pipeline, then open the gas water separator on the plug and fill the water
Use:It must be off the pump and the gas water separator water.
1.Before enter into the reservoir, must guarantee the normal operation.
2.Every week must open the test run time, prepare maintenance.
When working, should always check the vacuum gauge, vacuum regulator valve so that
the information listed below to ensure the normal operation of equipment.
Vacuum degasser play a important role in returning mud proportion and stabilize mud
performance in solids control system and drilling waste management. It also can be used
as a h-power agitator and applicable to all types of mud recycling system and mud cleaning system.