Working Principle of Drilling Mud Desander

Mud desander is the second solid control equipment used in solids control system. It is used to separate the solid phase particles with the diameter from 46 to 76 mm. Drilling mud desander has the main structure, 8″, 10″and 12″hydrocyclones, and high pressure flow pipes. Desander hydrocyclones are important parts. They provide efficient and reliable separation of sand and solids from produced water, condensate and gas stream. The size and type of hydrocyclone selected is dependent on the process fluids, temperature, pressure and the concentration and type of solids present in the liquid stream.

DSCI1130                                                  drilling mud desander

What is the work principle of hydrocyclone? Affected by the centrifugal force, the heavy solids in the fluids would be thrown to the inner wall of the cones, down to the bottom, and discharged through the sand discharge port. The diameter of the bottom discharge port is adjustable, and with a cover of hydrocyclone. In order to ensure the normal work of drilling mud desander and oilfield desilter, it is necessary to check their working condition regularly, and replace them with new ones.

OGEM Solids Control has engaged in solid control equipment manufacture. It has the rich experience in producing technical, high-quality and professional oilfield solid control equipment. Most importantly, OGEM Solids Control offers solid control equipment with reasonable prices and good service. OGEM oilfield drilling mud desander has durable hydrocyclones, and drilling mud desilter as well.

Welcome Inquiry ! ! !

发表评论

电子邮件地址不会被公开。 必填项已用*标注

您可以使用这些HTML标签和属性: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>